Project Detailsx
Client:Kiwirail / CMT Group
Location:Picton
Year Completed:2023
Category:Watermain Renewal
Project Overviewx
With the Picton ferry terminal upgrade the existing watermain pipeline had to be re- directed. This involved open trenching, butt welding and installation of valves, tees, bends and adapters. A full water shut down was required to complete the task and the window of time was narrow. Team work was crucial for the success of this job.
Specialist Work Required: Butt-welding DN355 HDPE with our CNC355 welding setup.